What was found
DURING SCHEDULED ROUTINE INSP, DISCOVERED VERTICAL STABILIZER UPPER RUDDER HINGE HAS CORROSION. REPLACED VERTICAL STABILIZER UPPER RUDDER HINGE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED ROUTINE INSP, DISCOVERED VERTICAL STABILIZER UPPER RUDDER HINGE HAS CORROSION. REPLACED VERTICAL STABILIZER UPPER RUDDER HINGE.