What was found
DURING SCHEDULED ROUTINE MX DISCOVERED LT ELEVATOR CENTER HINGE CORRODED AT BONDING JUMPER ATTACH POINT. REPLACED LT ELEVATOR CENTER HINGE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED ROUTINE MX DISCOVERED LT ELEVATOR CENTER HINGE CORRODED AT BONDING JUMPER ATTACH POINT. REPLACED LT ELEVATOR CENTER HINGE.