What was found
APB SUPPORT CHANNEL HAS .75 INCH CRACK AT UPPER FASTENER LOCATION. LBL 22 STA 1167 UPPER DOOR JAMB AREA. REMOVED AND FABRICATED REPAIR CHANNEL TREATED AND INSTALLED PER SRM'S 51-30-2, 51-30-5, 51-10-2, AND 51-10-3. TOTAL TIME: 29,567 HOURS. TOTAL CYCLES, 73,626. (X)