What was found
LEVEL 2 CORROSION ON FRAME AT STA 1216 BETWEEN LBL 16 AND LBL 9. FABRICATED NEW FRAME REPAIR SPLICE AND SUPPORT ANGLE AND INSTALLED PER SRM'S 51-30, 51-31-2, 51-10-2, AND 51-10-3. TOTAL TIME: 29,567 HOURS. TOTAL CYCLES, 73,626. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
LEVEL 2 CORROSION ON FRAME AT STA 1216 BETWEEN LBL 16 AND LBL 9. FABRICATED NEW FRAME REPAIR SPLICE AND SUPPORT ANGLE AND INSTALLED PER SRM'S 51-30, 51-31-2, 51-10-2, AND 51-10-3. TOTAL TIME: 29,567 HOURS. TOTAL CYCLES, 73,626. (X)