What was found
ETOPS SIGNIFICANT SYSTEM - RT OIL CONSUMPTION HIGH, ABOUT 2 QT PER HR. JUST PRIOR DESCENT 4 QTS ON DESCENT 1 QT, ON LANDING 3 QTS, ON SHUTDOWN 11 QT. FOUND B-NUT ON EEC OIL TEMP THERMOCOUPLE PROBE LOOSE. TIGHTENED AND RESAFTIED B-NUT. RESERVICED TO ENGINE SPECIFICATIONS, MOTORED AND IDLE RUN NR 2 ENG FOR 5 MINS. NO DEFECTS OR LEAKS NOTED.