What was found
FWD CARGO COMP INTERCOSTAL UPPER FLANGE CRACKED BETWEEN BS 654+66 TO 654+88 RBL 39, WL 200. REMOVED INTERCOSTAL UPPER FRAME AT STATION 654+77 RBL 39 WL 200 PER SRM 51-40-02-0 FIG 8, FABRICATED NEW FLANGE FROM MATERIAL 7075-T6, 0.0050" LOT 674775 PER SRM 53-30-54/101 DETAIL IV, DRAWING BAC 1490-2843, SRM 51-40-05/301 FIG 3. ALODINED PER MM 5121-01377 PER STEPS D-F, PRIMED PER M 51-21-10-377-003 & 51-21-10-307-020. INSTALLED PER SRM 51-40-02-06-0 STEP 4 PER MM 51-21-10-377-003 & 51-21-10-30-0201.