What was found
ETOPS SIGNIFICANT SYSTEM - NR 2 EGT ERRATIC AND FLUCTUATING BETWEEN 750-350 ON CLIMBOUT FOR APPROX 2 MINS, THAN STABLE. ACCOMPLISHED FIM 77-21-00 FIG 103, NO FAULTS OR DAMAGE. CHECKED ENG WIRING PER WDM 77-21-11 AND SSM 77-00-01 SHOOK HARNESS, NO FLUCTUATIONS. CLEANED ENG CONNECTORS ON PYLON AND JUNCTION BOX. RAN ENGS PER FIM 77-21-00, NO FLUCTUATIONS OF EGT NOTICED DURING 3 HIGH PWR RUN UPS. OPS CHECKED GOOD.