What was found
ETOPS SIGNIFICANT SYSTEM, L HYD PRI PUMP AND L ENG HYD PUMP EICAS MSG, AND ASSOCIATED PUMP LIGHT ILLUMINATED. PERFORMED FIM 29-11-00 REPLACED EDP PRESSURE SWITCH S26 ON NR 1 ENG 29-11-17, OPS CHECK LEAK CHECK OK.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
ETOPS SIGNIFICANT SYSTEM, L HYD PRI PUMP AND L ENG HYD PUMP EICAS MSG, AND ASSOCIATED PUMP LIGHT ILLUMINATED. PERFORMED FIM 29-11-00 REPLACED EDP PRESSURE SWITCH S26 ON NR 1 ENG 29-11-17, OPS CHECK LEAK CHECK OK.