What was found
ETOPS SIGNIFICANT SYS - CTR HYD DEMAND PUMP EICAS ILLUM ON ARRIVAL. REMOVED THE MODULATING VALVE FOR THE ADP IAW AMM 29-11-04. 4526. INSTALLED ADP VALVE IAW AMM 29-11-04 OPS CHECK IAW AMM 29-11-00/501. NO LEAKS NOTED.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
ETOPS SIGNIFICANT SYS - CTR HYD DEMAND PUMP EICAS ILLUM ON ARRIVAL. REMOVED THE MODULATING VALVE FOR THE ADP IAW AMM 29-11-04. 4526. INSTALLED ADP VALVE IAW AMM 29-11-04 OPS CHECK IAW AMM 29-11-00/501. NO LEAKS NOTED.