What was found
LEVEL 2 CORROSION ON HI - LOKS BETWEEN STATION 1053 AND 1076, LONGERON 25R. REPLACED CORRODED FASTENERS. PRIMED AND PAINTED PER SRM 51-22-01.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
LEVEL 2 CORROSION ON HI - LOKS BETWEEN STATION 1053 AND 1076, LONGERON 25R. REPLACED CORRODED FASTENERS. PRIMED AND PAINTED PER SRM 51-22-01.