What was found
ON TAKEOFF HAD N2 OVERSPEED (106%) FOR LESS THAN 2 SEC (REDUCE POWER TO MAINTAIN LIMIT) RT EEC1/R ENG CONTROL STATUS MESSAGE'S T/O ROLL FUEL FLOW. PERFORMED AMM TASK 72-00-00-206-258-N00. ENG OVERSPEED INSPECTION FOUND (N2 REP 105.6:26)ON ENG EXCEED PAGE PER FIG 601A OVERSPEED OCCURRED IN AREA A. BORESCOPE COMBUSTION LINER, HP & LP TURBINES FOUND OK TASK CARD 72-410-C1-2. CLOSED UP BORESCOPE PLUGS SAFETY & BOEING AMM TASK AMM TASK 71-00-00 TEST 15 CHL A & B ON PIMU SHOW MESSAGE 5VA TR CHECK FAIL LCC T/D CHECK FAIL AOG T/R CHECK FAIL. TASK 7100-00. REMOVED FMU PER MM 73-21-01. REMOVED FUEL PUMP PER AMM73-11-01. INSTALLED FMU PER AMM73-21-01 3A-FIN INSTLD FUEL PUMP PER AMM73-11-01-3A-G1. COMPLETED AMM 73-21-01 & AMM 73-11-01. HIPOWER RUN PEND PER ENG.ACCOMP HI POWER RUN NO DEFECTS NOTED INDICATIONS NORMAL.