Service difficulty report · Hydraulic Line · Boeing 717200
FAA SDR system
- Difficulty date
- August 23, 2018
- Submitted
- August 24, 2018
- Operation
- Air carrier
- Make and model
- Boeing 717200
- Aircraft serial
- 55122
- Aircraft time
- 27,672 hours, 65,173 cycles
- Part
- Hydraulic Line
- Condition
- Leaking
- Location
- Hydraulic Sys
- Stage of operation
- CR
- How discovered
- O
- Nature of condition
- K
- Precautionary procedure
- A
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DECLARED EMERGENCY FOR IN-FLIGHT HYDRAULIC FLUID LOSS. REMOVED AND REPLACED AUX PUMP HOSE.
More about the Boeing 717-200