Service difficulty report · Skin · Boeing 717200

Difficulty date
April 9, 2019
Submitted
April 12, 2019
Operation
Air carrier
Aircraft
N484HA
Make and model
Boeing 717200
Aircraft serial
55129
Aircraft time
27,298 hours, 63,889 cycles
Part
Skin
Condition
Dented
Location
Bs 218
Stage of operation
IN
How discovered
O
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DENT FOUND AT STA 218, L26L.// CUT OUT DAMAGE AREA PER SRM 53-03-01-2R-1 REPAIR 1 FIGURE 206 SHEET 3 CLASS 2 REPAIR. HFEC OK. FOUND LONGERON DAMAGED. THE DAMAGE IS 1" X .75" WITH A DEPTH OF .061" HFEC NO CRACKS NOTED. M66 SUBMITTED. VERIFIED STRAP MATERIAL PER E105-484325-INI TO BE 7075T6 .063". FABRICATED STRAP PER E105-484325-INI INSTALLATION PENDING. REPAIRED PER E105-484325-INI REV A. VERIFIED DOUBLER MATERIAL TO BE 2024-R3 .063" AND TAPERED SHIM MATERIAL TO BE 2024-T3 .050" PER SRM 5-03-01-2R-1. VERIFIED MATERIAL FOR NEW DOUBLER .063 2024T3. PREVIOUS DOUBLER DAMAGED. PICKED UP ALL HOLES ON DOUBLER AND AERO CHAMFERED PER SRM 53-03-01-2R-1 FIG 206 SHEET 3. FINAL SIZE OF HOLES ON DOUBLER PENDING. DOUBLER AND TAPER SHIM READY TO INSTALL. FILLER AND STRAPS PENDING. VERIFIED STRAP MATERIAL 7075T6 .063. FABRICATED FILLER PER SRM 53-03-01-2R-1 USING .050 2024T3. STRAP PENDING. FABRICATED STRAP PER E105-484326-PERM. INSTALLED CONICAL WASHERS. OK TO INSTALL ALL REPAIR PARTS 4-10-19. INSTALLED REPAIR DOUBLER FROM STA 218 TO AFT OF DOUBLER. REPAIRED PER SRM 53-03-01-2R-1 AND E105-484326-PERM REV ORIGINAL. ACCOMPLISHED PRESSURIZATION LEAK CHECK PER AMM 21-30-00-780-801. LEAK CHECK & PRESSURIZATION CHECK OK. OK FOR SERVICE.

More about the Boeing 717-200