Service difficulty report · Pump · Airbus A330243

Difficulty date
September 29, 2019
Submitted
October 2, 2019
Operation
Air carrier
Aircraft
N379HA
Make and model
Airbus A330243
Aircraft serial
1672
Aircraft time
18,067 hours, 2,793 cycles
Part
Pump
Condition
Leaking
Location
Hyd System
Stage of operation
IN
How discovered
9
Nature of condition
K
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

ETOPS SIGNIFICANT SYSTEM - #1 ENGINE GREEN HYDRAULIC PUMP LEAKING AT THE DRIVE PAD ATTACH POINT AND AT PUMP SPLIT LINE. // REMOVED AND REPLACED #1 GREEN HYDRAULIC PUMP GASKET AND SPLINE SEAL REF A330 AMM 29-11-51. OPS AND LEAK CHECK GOOD. OK FOR SERVICE.

More about the Airbus A330-243