Service difficulty report · Engine · Airbus A330243

Difficulty date
November 18, 2019
Submitted
December 10, 2019
Operation
Air carrier
Aircraft
N373HA
Make and model
Airbus A330243
Aircraft serial
1565
Aircraft time
25,127 hours, 3,905 cycles
Engine
Rroyce RB211TRENT77
Part
Engine
Condition
Vibration
Location
Nr 2
Stage of operation
CL
How discovered
O
Nature of condition
E
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

SUP - ETOPS SIGNIFICANT SYSTEM - DURING CLIMB OUT, ENG 2 IN STEADILY INCREASED PEAKING AT 5.0. WE GOT A BRIEF ADV ON ECAM. AT ALT VARIED BETWEEN 1.0 +1.5. INCREASED WITH INCREASED EPR DURING CLIMB. // TSS NOTE: #2 ENGINE SN #42396 VIBRATION HAS TRENDED HIGH AFTER 2 FAN BLADE LUBES. FAN UNBALANCE DATA WAS COLLECTED IN FLIGHT 84% N1 .4 IPS PHASE ANGLE A=120 MASS K= 65.1 PHASE B =145. WORKED SOLUTION IS SPACE CENTERED AND REQUIRES ONE EACH TRIM BOLT INSTALLED IN THE FOLLOWING POSITIONS 39,40,41,42 MPM BLT5562 43-7200-3-0020.PLEASE REF: AMM 71-00-00-700-848A SEE FIG LABELED SINGLE SHOT FAN TRIM BALANCE - WORKED EXAMPLE FOR GOOD EXPLANATION OF BOLT HOLES LOCATION. NOTE: COUNT COUNTER CLOCKWISE FROM TIMING MARK. THIS SOLUTION WAS WORKED WITH ROLLS AND TSS. VIBRATION SURVEY TEST 11 SHOULD BE DONE AFTER TRIM BOLTS INSTALLED. INSTALLED BOLTS AT LOCATION 39,40,41,42 ON #2 ENG PER AMM 71-00-00. HIGH POWER RUN SATISFACTORY WITH 1.1 VIBS AT 1.54 EPR. OK FOR SERVICE.

More about the Airbus A330-243