What was found
ENG FIRE LOOP A ECAM ON DECENT//PERFORMED OPERATIONAL TEST ENG FIRE AND DETECTION SYSTEM AMM 26-12-00 TEST PASS AIRCRAFT CONTINUE SERVICE MESSAGE CLEARED
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
ENG FIRE LOOP A ECAM ON DECENT//PERFORMED OPERATIONAL TEST ENG FIRE AND DETECTION SYSTEM AMM 26-12-00 TEST PASS AIRCRAFT CONTINUE SERVICE MESSAGE CLEARED