As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
ATB - ECAM AIR ENG 2 BLEED FAULT NOTED. ENG 2 BLEED SW PER ECAM PROCEDURE. REMOVED & REPLACED ENG 2 PRV PER AMM 36-11-52. OPS CHECK/LEAK CHECK OK. REMOVED & REPLACED PACK 2 FLOW CONTROL VALVE PER AMM 21-51-51. OPS CHECK/LEAK CHECK OK. OK FOR SVC.