What was found
HNL - FLT 247 - A/C ROLLS TO THE RIGHT IN ALL PHASED OF FLT, WITH FLAPS RETRACTED 2.5 UNITS OF LEFT AILERON TRIM REQUIRED. WITH FLAPS AT 5 DEGREES LEFT FLAP INDICATES 2 DEGREES LESS THAN RIGHT. 15 DEGREES FLAPS MINUS 3 DEGREES LESS .4 UNITS OF LEFT TRIM REQUIRED FOR FLAPS 15 DEGREES AND 25 DEGREES. GAUGE INDICATES SYMETRIC AT 50 DEGREES FLAPS. REPLACED LEFT INBOARD FLAP AFT HINGE BRACKET PER MM 27-51-01 OVERHAUL MANUAL. OPS CHECK OK CONDITION AND SECURITY CHECK OK. PRECAUTIONARY CHANGE OF ACTUATOR CYLINDER. LEAK AND OPS CHECK OK. REPLACED HINGE BOLT. (M)