What was found
MAIN ROTOR VIBRATIONS. CLEVIS ARM ASSY RECEIVED INSTALLED ON AIRCRAFT ON 12-26-94.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MAIN ROTOR VIBRATIONS. CLEVIS ARM ASSY RECEIVED INSTALLED ON AIRCRAFT ON 12-26-94.