What was found
NR 2 BETA LOCKOUT FAILED AFTER TAKE OFF. RETURNED TO FIELD. R & R BETA LOCKOUT SWITCH 6141-S6, NO FIX. R & R PLA SWITCH 6141-S4. OPS CHECKED GOOD. PERFORMED BETA LOCKOUT TEST FUNCTION, CHECK IAW RUN MANUAL. OPS CHECK GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
NR 2 BETA LOCKOUT FAILED AFTER TAKE OFF. RETURNED TO FIELD. R & R BETA LOCKOUT SWITCH 6141-S6, NO FIX. R & R PLA SWITCH 6141-S4. OPS CHECKED GOOD. PERFORMED BETA LOCKOUT TEST FUNCTION, CHECK IAW RUN MANUAL. OPS CHECK GOOD.