Service difficulty report · Outflow Valve · Emb EMB145LR

Difficulty date
September 27, 2018
Submitted
September 28, 2018
Operation
Air carrier
Aircraft
N639AE
Make and model
Emb EMB145LR
Aircraft serial
145182
Aircraft time
44,021 hours, 40,124 cycles
Part
Outflow Valve
Condition
Inoperative
Location
Cabin Pressure
Stage of operation
CL
How discovered
O
Nature of condition
J
Precautionary procedure
B

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

PDIS 639 21-30 1698241 27SEP18 IAD CLOSE IN CLIMB AT APROZ 15000 FEET CABIN ALTITUDE REACHED ORANGE. HANUAL IMPUT HAD ON EFFECT ALL PRESSURIZATION INDICATIONS WERE DASHES ONCE ON GROUND CREW WAS UNABLE TO OPEN PAX DOOR. CB F8 WAS CYCLED WHICH RELEASED PRESSURIZATION HISTORY: NO, ACFT DIVERTED AND DECLARED EMERGENCY MEL 27SEP18 08:00 IAD C27005 21-10-3 PRESS CONTROL AUTO MANUAL FACT 28SEP18 09:32 MDT REACTIVATED PRES. CONTROL SYSTEM REF 21-31-03.OPS CHECKED IN MAN AND AUTO MODE REF 21-31-00 OPS CHECK FAILED.TROUBLESHOT REF FIM 21-31-00-810-803A TO BLOCK 14.R&RD ELEC. OUTFLOW VALVE OPS/LEAK CHECK GOOD.AUTO PASSED MAN FAILED.R&RD PNEUMATIC OUT FLOW VALVE.OPS/LEAK CHECK GOOD.AUTO PASSED.MAN PASSED.REF 21-30-04&21-31-03 PER EMB145 AMM.OK FOR SERVICE

More about the Emb EMB-145LR