As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
SPS1 INOP AND SPS ADVANCE EICAS MSG ON TAKE OFF ROLL. MAINTENANCE: FOLLOWED FIM TASK 27-36-00-810-807-A - NO DEFECTS. NOTED REINSTALLED CTOR,SPC,AND RACK./// TRANSCRIBED TO HA300 SEQ #4 ON WORK PACKAGE DATED 02/04/21. AIRCRAFT IS STILL IN WORK R/R #1 AOA VANE. OPS CHECK GOOD