Service difficulty report · Control Valve · Emb EMB145LR

Difficulty date
March 31, 2021
Submitted
April 1, 2021
Operation
Air carrier
Aircraft
N620AE
Make and model
Emb EMB145LR
Aircraft serial
145102
Aircraft time
48,448 hours, 44,671 cycles
Part
Control Valve
Condition
Malfunctioned
Location
Brakes
Stage of operation
AP
How discovered
O
Nature of condition
J
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

PDIS 620 32-49 2362062 31MAR21 ORD CLOSE. AFTER SELECTING GEAR DOWN, BRAKE DEGRADED MSG APPEARED ON EICAS, MSG PERSISTED AFTER LANDING. LH OTBD BRAKE TEMP HIGHER THAN NORMAL (STILL IN THE GREEN RANGE)(NO RELATED CMC MESSAGES). FACT 01APR21 13:30 ORD. R&R RH BRAKE CONTROL VALVE IAW AMM 32-41-06, OPS CHECK AND LEAK CHECK GOOD. NO EICAS MESSAGE PRESENT AT THIS TIME. ALL OTHER INDICATIONS NORMAL OK FOR SERVICE

More about the Emb EMB-145LR