Service difficulty report · Relay · Emb EMB145LR

Difficulty date
September 1, 2021
Submitted
September 2, 2021
Operation
Air carrier
Aircraft
N646AE
Make and model
Emb EMB145LR
Aircraft serial
145213
Aircraft time
48,143 hours, 44,716 cycles
Part
Relay
Condition
Failed
Stage of operation
CL
How discovered
O
Nature of condition
J
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

ON CLIMB OUT PITOT 1 INOP CYCLED ON AND OFF FREQUENCY INCREASED ON DECENT. FACT 01SEP21 21:03 CLT T/S USING FIM TASK 30-31-00-410-801-A BLOCK 1-36 R&R RELAY K0111, REMOVED INSP + REINSTALLED RELAY K0056 R&R ANTI ICE PANEL. PERFORMED OPS CHECK 30-31-00 + FAIL STEP J1(C1) NO FIX. SLAVED IN #1 PITOT TUBE AND #4 STATIC PORT NO FIX. R&R RELAY K0111 AND PERFORM OPS CHECK IAW AMM 30-31-00-700-803-A. NO FIX. ON STEP (J)(1)(C) ONLY PITOT 2 AND 3 CAUTION MSG IS DISPLAYED WHEN THE N2 SIGNALS 2A C/B IS PULLED OK FOR SERVICE. PREVIOUS HISTORY: R/R RELAY K0053. R/R CURRENT SENSOR. R+R PITOT 1. R&R'D RELAY K0064. R&R RELAY K0056. USING FIM 30-31-00-810-801-A, BLOCKS 1,2,3,20,21,22,38,FOUND RELAY K0053 TO BE DISCOLORED.MEASURED CURRENT DRAW OF SYSTEM AT 7.5A.HAD GOOD GROUND AT PIN A-20 OF J1019 AT DAU#1 RACK CONNECTOR WITH PITOT 1 SYSTEM OPERATING. CHECK P0763 + P0087 FOR CORROSION,NONE FOUND.CHANGED RELAY BASE XK0053 + RELAY K0053. TRIMMED OFF B2 OF XK0056,(HAD NO PIN TENSION AT ALL) AND REPINNED. REPLACED K0056. SEE LOGPAGE 239931 SEQ#1 FOR REST OF SIGN OFF. OPS CHECK GOOD IN REF TO 34-13-00-05.TRIMMED OFF B2 OF XK0056,(HAD NO PIN TENSION AT ALL) AND REPINNED. REPLACED K0056. SEE LOGPAGE 239931 SEQ#1 FOR REST OF SIGN OFF. OPS CHECK GOOD IN REF TO 34-13-00-05.

More about the Emb EMB-145LR