Service difficulty report · Reinforcement · Emb EMB145LR

Difficulty date
October 1, 2022
Submitted
October 25, 2022
Operation
Air carrier
Aircraft
N918AE
Make and model
Emb EMB145LR
Aircraft serial
14500902
Aircraft time
40,592 hours, 35,508 cycles
Part
Reinforcement
Condition
Corroded
Location
Frms 61-63
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

E937968 - SSI 53-30-07 CORROSION ON INTERNAL FUSELAGE LOWER SKIN REINFORCEMENT PLATE BETWEEN FRAME 61-63 STRINGERS 21L-19L .... REMOVED AND INSTALLED SERVICEABLE DOUBLER AT FR 62-63, STGR 19L-20L IAW EMB 145 SRM 51-40-02 ALSO REMOVED AND INSTALLED THE FABRICATED DOUBLER AT FRAME 61-62, AND STRINGERS 19L-20L IAW EMB145 SRM 51-40-02.