What was found
RUD SYSTEM 2 INOP EICAS MESSAGE DURING T/O ROLL AT ABOUT 60 KTS. R/R #2 HYD PRESSURE TRANSMITTER IRW AMM 29-30-02 OPS CHECK LEAK CHECK GOOD. PERFORMED HIGH POWER ENG RUN AS REQ OK FOR SERVICE AT THIS TIME
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
RUD SYSTEM 2 INOP EICAS MESSAGE DURING T/O ROLL AT ABOUT 60 KTS. R/R #2 HYD PRESSURE TRANSMITTER IRW AMM 29-30-02 OPS CHECK LEAK CHECK GOOD. PERFORMED HIGH POWER ENG RUN AS REQ OK FOR SERVICE AT THIS TIME