What was found
ON CLIMB OUT BLEED 2 LEAK EICAS MSG. REMOVED RT PACK PANEL AND RT PACK VALVE PANEL FOR VISUAL INSPECTION OF BLEED LINES. NO DEFECTS NOTED DURING INITIAL INSPECTION. REINSTALLED PANELS WITH RETAINED HARDWARE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
ON CLIMB OUT BLEED 2 LEAK EICAS MSG. REMOVED RT PACK PANEL AND RT PACK VALVE PANEL FOR VISUAL INSPECTION OF BLEED LINES. NO DEFECTS NOTED DURING INITIAL INSPECTION. REINSTALLED PANELS WITH RETAINED HARDWARE.