What was found
STRUCTURAL DEFECT DISCOVERED DURING SCHEDULED INSPECTION (PHASE 5). METAL FATIGUE, CANTED BULKHEAD, STRUCTURAL REPAIR INITIATED, AND WORK IS IN PROCESS.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
STRUCTURAL DEFECT DISCOVERED DURING SCHEDULED INSPECTION (PHASE 5). METAL FATIGUE, CANTED BULKHEAD, STRUCTURAL REPAIR INITIATED, AND WORK IS IN PROCESS.