What was found
THE LT NACELLE OTBD ENG BEAM WAS FOUND TO BE CRACKED JUST FWD OF AFT ENG MOUNT, TRANSVERSE TO LENGTH OF BEAM, ACROSS UPPER FACE OF BEAM, DURING NDT PRESCRIBED WITHIN MEL-54-01. REMOVE BEAM ASSEMBLY FROM NACELLE, PERFORM DETAILED VISUAL INSPECTION OF SURROUNDING STRUCTURE & INSTALL NEW BEAM ASSEMBLY. A SUPPLEMENT TO THIS SDR WILL BE SUBMITTED ILLUSTRATING RESULT OF X-RAY INSPECTION.