What was found
DURING HEAVY CHECK INSPECTIONS ZL-261-GVI-10000, MULTIPLE CORROSION SPOTS WERE FOUND ON INNER SURFACE OF FUSELAGE SKIN BETWEEN FRAMES 40 TO 44 STRINGERS 5-13 LT SIDE. 4 CORRODED AREAS BLENDED OUT IAW INSTRUCTIONS DO/TS-4390/11-15789. 3 CORRODED SPOTS REPAIRED IAW SRM PRINCIPLES 53-00-00, FIG 401/402/403 AND TEN OTHERS SPOTS BLENDED OUT FOLLOWING INSTRUCTIONS DO/TS-4458/11.15789 AND EMAIL REF DATED AUG-01-2011. T3 LAST CORROSION SPOTS ON SECTION 18 CUT-OUT AND EXTERNAL DOUBLER INSTALLED IAW INSTRUCTIONS OITS-4727/11-15789. ALL REPAIRS CONFIRMED WITHOUT DEVIATION BY EMAIL REF. ANA/E/6404/20114-004, /E-005 AND/E-006. ISSUE C: PERFORATED MACHINED DOUBLER UNDER FRAME, 41 BTW STR 11-12 LTS BLEND-OUT AND INSPECTED FOLLOWING INSTRUCTION REF DT/S-359/11-16319 AS CONFIRMED BY EMAIL ANA REF. ANA/E/6404/20LL/E-010. ALL REPAIRS APPROVED BY ART UNDER SRAS DO/TS-4727/11...6639 AND PERFORMED USING ABOVE INSTRUCTIONS UNDER W/O 17077 TASKS 11-14, 16-18, 23-27, AND 29. SUPPLEMENTARY INSP TASK: INTERVAL DVI OF BLENDED AREA FOR NEW CORROSION WITH THRESHOLD INTERVAL 2 YEARS.