As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DURING ROUTINE SCHEDULED INSPECTION, THE RT NACELLE CROSSOVER BEAM WAS FOUND TO BE CRACKED AT LWR U CHANNEL. CORRECTIVE ACTION WILL BE TO REMOVE & INSTALL RT NACELLE CROSSOVER BEAM IN ITS ENTIRETY. A SUPPLEMENT TO THIS SDR HAS BEEN SUBMITTED TO FURTHER OUTLINE DAMAGE POINT LOCATION & DETAILS.