What was found
DURING POST-FLIGHT INSPECTION, TWO BOLTS ON THE RIGHT MAIN GEAR WHEEL ASSEMBLY WERE FOUND TO BE SHEARED OFF. THE WHEEL ASSEMBLY WAS REPLACED WITH NO ADDITIONAL DEFECTS NOTED.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING POST-FLIGHT INSPECTION, TWO BOLTS ON THE RIGHT MAIN GEAR WHEEL ASSEMBLY WERE FOUND TO BE SHEARED OFF. THE WHEEL ASSEMBLY WAS REPLACED WITH NO ADDITIONAL DEFECTS NOTED.