What was found
LVL 2 CORROSION ON MAIN CARGO DOOR HINGES 3-6. REMOVED AND REPLACED HINGES PER ER 17-01722 REV 1R DTD 3/21/2017 WITH 8110-0 DTD MARCH 20 2017. WORK DOCUMENTED ON JOB 722361 CARD 00118
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
LVL 2 CORROSION ON MAIN CARGO DOOR HINGES 3-6. REMOVED AND REPLACED HINGES PER ER 17-01722 REV 1R DTD 3/21/2017 WITH 8110-0 DTD MARCH 20 2017. WORK DOCUMENTED ON JOB 722361 CARD 00118