Service difficulty report · Thrust Link · Boeing 737

Difficulty date
September 3, 2024
Submitted
September 3, 2024
Operation
General aviation
Filed by
ICRR255X
International Component Repair LLC
Make and model
Boeing 737
Part
Thrust Link
Part number
310A20419
Condition
Cracked
Location
Engine Mount
Stage of operation
NR
How discovered
M
Nature of condition
O
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CRACK FOUND DURING MAGNETIC PARTICLE CHECK (SOPM 20-20-01)