What was found
INSPECTION TYPE:SV SURVEY SEQUENCE 752-F1-32, FUSE EXT SURFACE, STA 126 TO STA 135, L2712-L, REPAIR CONFIGURATION DOES NOT CORRELATE TO SRM. REMOVED EXISTING REPAIR IAW DC8 SRM 51-1-21. FABBED DOUBLER REF DC8 SRM 53-2-1 AND INSTALLED REPAIR IAW DC8 SRM 53-2-1 FIG 7, TR 53-203 SH 13.