What was found
INSPECTION TYPE:C2 MAIN CARGO FLOOR UPPER FLOOR SUPPORT HAS CORROSION ON ENTIRE SUPPORT BRACKET AT STA 1024 FROM LBL 1 TO LBL 22 WL208. FABRICATED FLOOR SUPPORT AND UPPER SKIN COMMON TO FLOOR SUPPORT, ALODINED AND PRIME, INSTALLED REF SRM 51-40-05-0G, SRM 51-20-01-0G, SRM 53-00-51-1A-1 FIG 101 DETAIL II, BOEING DWG 144N5003.