What was found
INSPECTION TYPE:C12 EA ANGLES AT FR79 RT AND LT HAVE 90 DAY LEAD TIME. EXTRUSION HAS 120 DAY LEAD TIME NEED TO FABRICATE TO AN ALTERNATE EXTRUSION FAB IAW EO A300-5310-5310-56895-A.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
INSPECTION TYPE:C12 EA ANGLES AT FR79 RT AND LT HAVE 90 DAY LEAD TIME. EXTRUSION HAS 120 DAY LEAD TIME NEED TO FABRICATE TO AN ALTERNATE EXTRUSION FAB IAW EO A300-5310-5310-56895-A.