What was found
INSPECTION TYPE:C12, EACH ANGLE AT FR79 RT AND LT HAVE 90 DAY LEAD TIME. EXTRUSION HAS 120 DAY LEAD TIME, NEED TO FABRICATE TO AN ALTERNATE EXTRUSION. FABRICATION IAW EA A300-5310-5310-56895-A.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
INSPECTION TYPE:C12, EACH ANGLE AT FR79 RT AND LT HAVE 90 DAY LEAD TIME. EXTRUSION HAS 120 DAY LEAD TIME, NEED TO FABRICATE TO AN ALTERNATE EXTRUSION. FABRICATION IAW EA A300-5310-5310-56895-A.