What was found
INSPECTION TYPE:1C/3CENTER FUSELAGE BASE FRAME FITTING AT FR46 LH SIDE HAS A CRACK.ACCOMPLISHED MAJOR PER UPS EO A300-5310-46789-G APPENDIX J.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
INSPECTION TYPE:1C/3CENTER FUSELAGE BASE FRAME FITTING AT FR46 LH SIDE HAS A CRACK.ACCOMPLISHED MAJOR PER UPS EO A300-5310-46789-G APPENDIX J.