What was found
INSPECTION TYPE:NA*EMERGENCY DECLARED* CONFIGURING FOR LANDING, UPON SELECTION OF FLAP 15Ï¿½. ECAM "FLAPS SYS 2 FAULT" APPEARED. RAN QRH PROCEDURE FOR FLAPS FAULT. PER PROCEDURE FLAPS EXTENDED TO 30/40 FOR APPROACH AND LANDING. FLAPS EXTENDED SLOWER THAN NORMAL TO 30/40R&R PRESS S/W AT BLOCK VLV 24CV, NO HELP. R&R BLOCK VALVE 24CV PER AMM 27-54-33-0401, OPS CHECK NORMAL AT THIS TIME, NO LEAKS NOTED, OPERATED FLAPS TO 40 DEG & TO FULL UP POSITIONS SEVERAL TIMES, NO FAULTS NOTED. PER TECH SUPPORT BLOK VLV P/N ON/OFF 658A0000-02, S/N ON 1980, S/N OFF 1906,