What was found
*SUPPLEMENTAL SDR* R\H PYLON, HYD BAY, AFT SIDE OF PYLON BULKHEAD, UPPER SUPPORT ANGLE, I\B SIDE, HAS AN 1 1\2 INCH CRACK. VERIFIED HEAT TREATMENT PER NDTM, PART 4, 51-00-10. COMPLETED INSTALLATION PER DRAWING 313N3052
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
*SUPPLEMENTAL SDR* R\H PYLON, HYD BAY, AFT SIDE OF PYLON BULKHEAD, UPPER SUPPORT ANGLE, I\B SIDE, HAS AN 1 1\2 INCH CRACK. VERIFIED HEAT TREATMENT PER NDTM, PART 4, 51-00-10. COMPLETED INSTALLATION PER DRAWING 313N3052