What was found
APG, UPON EXTENSIVE STRUCTURE REPAIR OF L/H WING O/B FLAP REQUIRES REPLACEMENT, 57-57. REMOVED L/H WING O/B FLAP S/N 079.INSTALLED TRACKS SUPPORT VANE 5EA IN REF TO MD-11 AMM 27-50-34-400-801,SPRING CARTRIDGE IN REF TO MD-11 AMM 27-51-04-400-802 & I/B AND O/B CARRIAGE IN REF TO BOEING CMM 27-52-04.PERFORMED OPS CHECK AND ADJUSTMENT L/H WING O/B FLAP VANE IN REF TO MD-11 AMM 27-50-32-830-801. TOOL USED CALIPER ID/20-105 DUE 31-MAY-2025, T/W ID/19-1235 DUE 23-APR-2025.OPS CHECK AND ADJUSTMENT GOOD.