What was found
FAULT: CRACK FOUND IN MIDDLE HOLE ON FR40 LH UPPER TENSION FASTENER. REPAIR PER A300-600F SRM REV 41 CHAP 57-10-24-201 PARA 5.A, FIG 202 & FIG 206 SHEET 2 (REPAIR WITH BUSH).UPS CONSIDERS THIS A MINOR REPAIR PER GMM 05.04.CAUTION: THE WORK INSTRUCTIONS CONTAINED WITHIN (OR APPROVED BY) THIS EO CONTAIN RII INSPECT REQUIREMENTS AND RII BUY-OFF WHICH MUST BE PERFORMEDBY A PROPERLY TRAINED AND CURRENTLY AUTHORIZED INDIVIDUAL.TO DETERMINE RII AUTHOR, REFER TO CURRENT RII AUTHORIZATION LIST, SEE CHAPTER 04 OF THE GMM. ACCOMP REPEAT INSPECT PER SRI CHAPTER 57-10-24 PAGE BLOCK 201, TABLE 202.FIRST INSPECT 3700 FC/8100FH FROM TIME OF ADL/REPAIR EMBODIMENT (WHICHEVER VALUE OCCURS FIRST). <BR>- SUBSEQUENT INSPECTION AT INTERVALS OF 3700FC/8100 FH (WHICHEVER VALUE OCCURS FIRST).<BR>- INSPECTION METHOD REFER TO 57-10-24, PAGE BLOCK 201, FIGURE 208.