What was found
CRACK - STRAP, FWD LOWER CARGO MAIN DECK FLOOR STRUCTURE STA 610 RBL 64.5. INSTALL THE REPAIR PARTS WET WITH BMS 5-95 FAYING SURFACE SEALANT. REFER TO FIGURE 2. INSTALL ALL HI-LOKS WET WITH BMS 5-95 SEALANT IN TRANSITION FIT HOLES PER 767-300F SRM 51-40-05. SHIM ALL GAP BEYOND 0.005 INCH PRIOR TO FASTENER INSTALLATION. INSTALL FASTENERS PER 767-300F SRM 51-40-02. RESTORE ALL SURFACE FINISHES PER 767-300 AMM 51-21 AND DRAWING REQUIREMENTS. 22.APPLY CORROSION INHIBITING COMPOUND IN THE REPAIR AREA PER 767-300 AMM 51-24-09 AS REQUIRED(REPLACE) REVIEW COMPLETED