What was found
MAIN CARGO DECK FLOOR STRUCTURE BETWEEN FRAMES 74 AND 75, Y2127.5 HAS A CRACK ON Z CHANNEL VERIFIED STEP # 16 OF EA # 300-5318-27-A4081 OF PRELIMINARY 2 WERE RII
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MAIN CARGO DECK FLOOR STRUCTURE BETWEEN FRAMES 74 AND 75, Y2127.5 HAS A CRACK ON Z CHANNEL VERIFIED STEP # 16 OF EA # 300-5318-27-A4081 OF PRELIMINARY 2 WERE RII