What was found
DIVERSION, EMERGENCY DECLARED, DURING CLIMB PASSING APPROXIMATELY 20,000 FT WITH EPR'S MATCHED AT CLIMB POWER WE NOTICED RIGHT HAND ENGINE EGT AMBER AT 800 DEGREE AND CLIMBING. IN ADDITION, N1 AND FUEL FLOW WERE SEE ATTACHED PAGE. INSPECTED,CLEANED,PRESSURE TESTED P1 LINES, ACCOMPLISHED ENG, PP AND TO ASSURANCE RUN ALL OPS GOOD.