What was found
OPERATIONAL TEST OF THE EMERGENCY POWER-SUPPLY UNITS WITH BITE CHECK FAILS. REF STEP 15 OF PSM. T/S PER TSM 33-51-00/101. FOUND UNIT FAULT LIGHT ILLUMINATED ON ESPU. REMOVED AND REPLACED ESPU IAW MM 33-51-14/0401. ALL OPS CHECK GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
OPERATIONAL TEST OF THE EMERGENCY POWER-SUPPLY UNITS WITH BITE CHECK FAILS. REF STEP 15 OF PSM. T/S PER TSM 33-51-00/101. FOUND UNIT FAULT LIGHT ILLUMINATED ON ESPU. REMOVED AND REPLACED ESPU IAW MM 33-51-14/0401. ALL OPS CHECK GOOD.