Service difficulty report · Bracket · Airbus A300F4622R

Difficulty date
March 3, 2026
Submitted
March 30, 2026
Operation
Air carrier
Aircraft
N135UP
Make and model
Airbus A300F4622R
Aircraft serial
0818
Aircraft time
28,114 hours, 17,335 cycles
Part
Bracket
Part number
A5461133100000
Condition
Cracked
Location
Zone 400
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

NR 1 ENG INBD SIDE, DURING ENGINE INSTALLATION FOUND SUPPORT BRACKET THAT ATTACH FUEL AND HYDRAULIC HOSES CRACKED. REMOVED THE HYDRAULIC AND FUEL JUNCTION BOX IAW AMM 70-00-00-401. INSTALLED HYDRAULIC AND FUEL JUNCTION BOX IAW AMM 70-00-00-401 AND IAW AMM 29-12-67/401 ITEM C., PERFORMED VISUAL CHECK FOR HYDRAULIC FLUID LEAKAGE AT THE CONNECTIONS NO FOUND.

More about the Airbus A300 F4-622R