What was found
APU INLET SURROUND STRUCTURE AFT LANDING HAS CORROSION AROUND NUTPLATES. INSTALLED FABRICATED REPAIR PARTS (5EA) -1 STRAP, -2 STRAP, -3 FILLER, -4 FILLER AND -7 OUTER STRAP AT APU INLET SURROUND STRUCTURE AFT LANDING IAW B757-200PF SRM 53-80-15-2R-1 REP.1 DETAIL L