Service difficulty report · Thrust Bracket · Airbus A300F4622R

Difficulty date
July 15, 2026
Submitted
August 11, 2026
Operation
Air carrier
Aircraft
N136UP
Make and model
Airbus A300F4622R
Aircraft serial
0819
Aircraft time
29,160 hours, 17,946 cycles
Part
Thrust Bracket
Part number
B53774141224
Condition
Corroded
Location
Zone 200
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

MDC RT SIDE, FLOOR SKIN BETWEEN -Y2462 AND -Y1959 FR27 WITH CORROSION. INSPECTED AND VERIFIED STEP 12 THRUST BRACKET BETWEEN FR 26 AND FR 27 SURFACE PROTECTION RESTORED IAW SRM 51-21-10. INSTALLED THRUST BRACKET BETWEEN FR 26 AND FR 27 IAW SRM 51-40-21.

More about the Airbus A300 F4-622R